The ongoing $19 billion transformation at JFK Airport is an extensive and vital project that will modernize New York City’s primary international gateway. The new Terminal One is central to this development, aiming to enhance passenger experience, increase capacity, and position JFK as a world-class, sustainable hub for air travel.

Services Used

Waterproofing, TPO, Roofing

Project Size

480,000 Sqft

Location

John F. Kennedy International Airport

General Contractor

Wolkow Braker Roofing Corporation

Scope

At Eyebrow AVB prime areas, installed Henery Blue Skin. Tied all eye brow work into EPDM Eyebrow Flashing. Mechanically Fastened Substrate Board to roof Deck, Installed EPDM Vapor Barrier over substrate board. Installed walkway pads per provided layout. Mechanically Fastened 2 layers of insulation/composite board. Installed PVC Membrane with adhesive to meet 30 year detail of manufacture. laid all air welds of all seams/penetrations/patches etc for a complete system.

Owner

The City of New York