The redevelopment of Terminal 6 at JFK is a critical piece of the $19 billion overhaul of the airport. With its expanded capacity, modern design, advanced technology, and commitment to sustainability, the upgraded terminal will enhance the overall passenger experience while improving the airport’s operational efficiency. This redevelopment will ensure that JFK remains a leading international gateway and strengthens its position in global air travel.

Services Used

Weather Resistive Barrier Base - Roofing

Project Size

33,000 Sqft

Location

John F. Kennedy International Airport

General Contractor

Certified Interiors

Scope

Installed Vaportite, 3" rigid insulation & 5/8" dens deck prime on the side and top of the parapets - Furnished and Installed Grace perm-a-barrier on exterior sheathing approx 15'-0" high on the ground floor. Including returns for door and window openings.

Owner

The City of New York