The Terminal 8 Gates 45-47 PVC roofing project at John F. Kennedy (JFK) Airport involves the installation of a durable PVC roofing system over these specific gates. The project aims to replace the existing roof with a high-performance PVC membrane, known for its weather resistance, durability, and energy efficiency. This upgrade is part of ongoing efforts to maintain and enhance the infrastructure of JFK Airport, ensuring that the terminal areas are better equipped to handle environmental conditions while improving long-term maintenance and operational efficiency.

Services Used

Roofing

Project Size

10,000 Sqft

Location

John F. Kennedy International Airport

General Contractor

Holt

Scope

PVC Roofing

Owner

The City of New York